壹号半岛
Placio One
业主单位:香港置地集团公司
建筑设计:上海天华建筑设计有限公司
项目规模:94,000 平方米
建筑面积:180,000 平方米
建成时间:2019 年 6 月
设计周期:6 个月
Owner:Hongkong Land Limited
Architectural Design Consultant:Shanghai
TIANHUA Architecture Planning &Engineering
Ltd.
Project Scale:94,000 sqm
Construction Area:180,000 sqm
Date of Completion:2019.06
Cycle of Design:6 months
项目位于重庆市照母山以北,紧邻黄桷水库, 筑端庄挺拔,细节上又配以精细的铝型材,使
是约克北郡最后一块沿湖土地, 8000 平米的 整个建筑简洁不简单。
集中绿地和长达 2.4 公里的沿湖水岸线是项目
的独特资源。项目因地制宜,采用台地式布 The project is located in the north of Zhaomu
局。一期为大平层产品,350 平米产品面宽可 Mountain in Chongqing City, next to Huangpi
达 26 米,相当于一个展开的别墅面宽。设计 Reservoir. It is the last piece of land along
上采用双流线,后勤流线与休闲公区互不干扰。 the lake in North Yorkshire. The 8,000 square
建筑体型简洁方正,采用三段式构图方式,建 meters of concentrated green space and
the 2.4 km long shoreline along the lake are
unique resources of the project. The project
is adapted to local conditions and adopts a
platform layout. The first phase is a large flat
floor product, features a 350 square meters
surface with an extraordinary 26 meters span
width, as it equivalent to the width of an
unfolded villa. The design features double
streamlines, while the logistics streamlines
and the leisure common area are not
interfere with each other.The building's
shape is simple and upright, with a three-
segment composition method, the building
is dignified and upright, and the details are
complemented by fine aluminum profiles,
making the whole building simple but not
easy.
设计团队
Design Team
聂欣,陈海涛,苏波,姜勇,周永强,李仕游,
周燕,简婷,唐坦,喻权
207